Home / Repair
Boat Lift Repair in Key Largo
Boat lift repair in Key Largo can be as small as a cable or as big as new pilings. Tell us what you're seeing. We pass it to a licensed marine contractor, and they come look.
Look at the cable first
Bob Adriance wrote about lift claims for BoatUS Magazine in a piece called “Boat-Lift Blues And Falling Boats.” Two of his lines are worth taping inside the switch box.
“Concentrations of heavy rust indicate that the steel cable itself has lost considerable strength.”
And: “First, rinse saltwater off the cable every time you launch the boat.”
If the cable looks orange, don't raise the boat on it again until someone has checked it.
The county form you'll sign
For a permit on a dock, seawall or boat lift where the crew works over the water, Monroe County's Building Department wants a notice signed by both you and the contractor. It's about the federal Longshore and Harbor Workers' Compensation Act.
Read its last line. You may be liable for an injury if the contractor doesn't carry that coverage. Ask to see it before anyone starts.
When the dock is the problem
Sometimes the lift is fine and the pilings under it aren't. Florida's permit exemptions cover repairing or replacing an existing dock within 5 feet of the same spot, no bigger, with no fill. That's paragraph (d) below.
What the county and the state say
The county notice (body text, without the signature and notary blanks), then two pieces of s. 403.813.
WORK OVER THE WATER NOTICE
PERMITS FOR DOCKS, SEAWALLS, BOAT LIFTS OR ANY OTHER PERMITS WHERE IT MAY BE NECESSARY TO WORK OVER THE WATER (SUCH AS BUT NOT LIMITED TO BARGES AND BOATS) MUST HAVE THE FOLLOWING NOTICE SIGNED AND DATED BY THE CONTRACTOR AND OWNER AT THE TIME THE PERMIT IS ISSUED.
“FEDERAL LAW ENTITLES CERTAIN LAND BASED EMPLOYEES ENGAGED IN WORK ADJACENT TO NAVIGABLE WATERS, INCLUDING BUT NOT LIMITED TO CONSTRUCTION WORKERS ON DOCKS, TO COMPENSATION FOR WORK-RELATED INJURIES. ACCORDINGLY, YOU MAY NEED TO OBTAIN INSURANCE COVERAGE UNDER THE LONGSHORE AND HARBOR WORKERS’ COMPENSATION ACT, 33 U.S.C. 901, ET.SEQ.”
I have read and understand the aforementioned notice.
As the owner, I understand that if the Contractor does not obtain proper insurance coverage, I may be liable in the event of injury.
Official source: Monroe County, Work Over the Water Notice (PDF). Quoted word for word, read Nov 21, 2026.
(d) The replacement or repair of existing docks and piers, except that fill material may not be used and the replacement or repaired dock or pier must be within 5 feet of the same location and no larger in size than the existing dock or pier, and no additional aquatic resources may be adversely and permanently impacted by such replacement or repair. This does not preclude the use of different construction materials or minor deviations to allow upgrades to current structural and design standards.
Official source: Section 403.813, Florida Statutes (2026), Online Sunshine. Quoted word for word, read Nov 21, 2026.
2. The owner of a structure that qualifies for an exemption under this paragraph is not required to obtain permission to use or occupy lands owned by the Board of Trustees of the Internal Improvement Trust Fund, and, with the exception of those structures attached to a bulkhead on a parcel of land where there is no docking structure, the structure may not be subject to any more stringent permitting requirements, registration requirements, or other regulation by any local government. For a floating vessel platform to be attached to a bulkhead on a parcel of land where there is no docking structure, a local government may require the platform owner to obtain a permit or one-time registration of the floating vessel platform as necessary to ensure compliance with local ordinances, codes, or regulations. A local government may require only a one-time registration of all other floating vessel platforms where the platform owner self-certifies compliance with the exemption criteria in this section to ensure compliance with ordinances, codes, state-delegated or state-mandated plans or programs, or regulations relating to building or zoning, which may not be applied more stringently than, or inconsistent with, the exemption criteria in this section and address subjects other than subjects addressed by the exemption criteria in this section; and to ensure proper installation, maintenance, and precautionary or evacuation action following a tropical storm or hurricane watch of a floating vessel platform or floating boat lift that is proposed to be attached to a bulkhead or parcel of land where there is no other docking structure.
Official source: Section 403.813, Florida Statutes (2026), Online Sunshine. Quoted word for word, read Nov 21, 2026.
Storm on the way? Read boat lift hurricane prep first.
Lift stuck, slow or rusty?
Tell us the street, the lift type and what it's doing. A licensed contractor will call.